Search results

  1. Ab12

    UFH and CH S plan

    No salus rad stat currently. Only have the salus wiring centre and sq610 for the UFH zones (wired) Might go hive or Tado now for the CH...
  2. Ab12

    UFH and CH S plan

    Just the built in air sensor
  3. Ab12

    UFH and CH S plan

    What would you use instead for the UFH zones (if/when these fail). I expect I can't use single channel hives for each of those 5 ufh zones?
  4. Ab12

    UFH and CH S plan

    Ok thanks. Realised now I keep confusing wiring centre with ufh control centre. Will draw again tonight and see if I make sense of it On the last question, I'm confident enough... (Will make sure I'm comfortable on paper before getting to actual wiring) ... And no money left to pay anyone to...
  5. Ab12

    UFH and CH S plan

    So in that case. The orange SL from pump can go direct to boiler in the Lr position to activate it once the chain is formed from thermostat calling?
  6. Ab12

    UFH and CH S plan

    Yep that's the one. So should I send a perm live into one of the holes too? And use one wire out to the valve/pump?
  7. Ab12

    UFH and CH S plan

    Seems Volto free. How would the two wires work from it? One wire in is perm live, then one wire out is that live out so to speak...
  8. Ab12

    UFH and CH S plan

    Haha, typo. I got it right at the bottom
  9. Ab12

    UFH and CH S plan

    Is hive programmable? I.e timer option built in
  10. Ab12

    UFH and CH S plan

    Pasting Madlabs post from other thread: You wiring is wrong, you don't send perm lives to the 2 ports otherwise they would just stay open all the time. You don't need to use the boiler output at all either, unless it's being used to power a central wiring centre. The permanent power normally...
  11. Ab12

    UFH and CH S plan

    So I have 1. Ufh wiring centre, salus 2. Ufh wired sq610 stats for each room, salus - they seem to be programmable I was intending to get for the CH (because I could make it all salus and online controllable): and remove the current timer built into the boiler - but I am open to alternatives...
  12. Ab12

    UFH and CH S plan

    Don't need to keep it if it simplifies things. Happy for stats to control everything, if a programmer isn't needed... (Guess it's only needed for CH?)
  13. Ab12

    UFH and CH S plan

    https://www.worcester-bosch.co.uk/professional/support/literature/greenstar-cdi-compact-combi-installation-instructions I have this one
  14. Ab12

    UFH and CH S plan

    Smart phone when out and about if possible. I do however have the salus controller and thermostats for UFH, so a bit stuck with those. What's so dire about them?
  15. Ab12

    UFH and CH S plan

    Ah sorry, will delete the other!
  16. Ab12

    UFH and CH S plan

    What other brand would you recommend? I haven't yet bought the CH heating thermostat/controller
  17. Ab12

    UFH and CH S plan

    Thanks I can already see where I made error with the 'brown' live, it should be connected to what comes out of my ufh controller, and the grey wire should be connected to permanent live 240 volts on the valve. Any idea on this though?
  18. Ab12

    UFH and CH S plan

    So I've managed to get 2 zone valves plumbed in, one for my CH, one for my UFH. Now on to wiring. I am using a Worcester Bosch 35cdi combi. Wiring diagram attached. I have also drawn what I think is the right wiring plan, but would like a little look over help please, anything a miss? I've...
  19. Ab12

    UFH, combi and seperate CH

    Double post removed
  20. Ab12

    CCTV junction box mount alternative?

    Sadly these hikvisions dont have space behind them for the wiring to be stored so definitely need mounts. Have new ones on order
Back
Top