Hi, Im installing a new shower cubicle and was wondering if I need to coat the moisture resistant wallboard with anything before I tile on top. Does the tile adhesive, tiles and grout provide a good enough water barrier?
It's beyond leak sealer. Please look at the picture in my album. Someone must know if the big hex nut just above the valve on the metal bulkhead comes off or not. Am i chapping it off with a chisel? How does the valve come out?
Right i'm a bit confused now. There is a top nut, big middle hex nut, and bottom nut below the valve. Is the middle hex nut part of the bulkhead and can't be turned? Is it just the nut above and below it that are to be removed?
Thank you very much mate! I thought they were part of the boiler frame. The nut above the big hex, does that just unscrew anti clockwise as well? It seems to be solid
Hi, Just registered on here in the hope that someone can tell me how to remove my leaking CH in and out isolating valves on my worcester 230 combi boiler. I have disconected both copper pipes going into the valves but how do you get them out the bulkhead? The nut boiler side of the valves won't...