  1. B

    Power to my garage

    Ok, the socket outlet is going to be SELV socket BS EN 60309-2 25V and I've decided that the lighting (2 bulkheads) will be to class 2. Now I know the garage will be classed as Zone 2, but the inspection pit (thats what I'm going to dig) Me thinks should be classed as Zone 1. That...
  2. B

    Power to my garage

    I'm doing some work in garage and shed (Part-P I know), but I'm just trying to understand what these classes mean? Is this right? class 1 - Normal ceiling rose/ batten holder, knockout box/ Pattras? class 2 - Double insulated fitting i.e. No earth required? class 3 - I'm not sure
  3. B

    Inspection Pit

    I'm planning to build an inspection Pit inside of my garage. I've alraedy had it checked it and there won't be any problems with foundations, etc. What my question is what precautions should I make before starting work, the pits only going to 1 metre deep. Any suggetions would really help
  4. B

    Electrics Shower - HELP!!!

    you mean a 7.5kw shower?
  5. B

    where does the phase go...

    I meant thursday... But I am in trouble.
  6. B

    where does the phase go...

    Switch feed bottom Top out to lamp??? Sorry I've got my test on Friday and i'm jusat getting really really confused with revision
  7. B

    Proving that a GS38 voltage indicator is working?

    sorry your right thanks
  8. B

    procedures that you would follow when undertaking electrical

    procedures that you would follow when undertaking electrical tests on a fluorescent lighting circuits. Precautions - Power locked off at CSU. Equipment checked to be working correctly Tests - Continuity of CPC and Insulation Resistance Any others? Thanks in Advance
  9. B

    Proving that a GS38 voltage indicator is working?

    HELP HELP HELP HELP HELP I've got to put this in tommorow or they'lle stop me from doing my AM1 course! Thanks in advance
  10. B

    where does the phase go...

    on a single, double and intermediate switch? Thanks in advance
  11. B

    Proving that a GS38 voltage indicator is working?

    I'll be honest I'm a student doing electrical installation at college and they want two ways of proving the correct operation of a gs38 voltage indictor. I know what it is I've seen one, but they never bothered saying how to proof it! Does any one have another answer to go with previous...
  12. B

    Proving that a GS38 voltage indicator is working?

    Proving that a GS38 voltage indicator is working? Any1 got any idea
  13. B

    what test equipment should i use

    ... to test a final ring circuit (sockets), an ohmeter and?
  14. B

    OPEN CIRCUIT

    what is the possible outcome if a final ring circuit was used with an open circuit in the live conductor? thanks in advance would it be a failure of polarity and the Protective device cutting out?
  15. B

    Oven & Hob wiring

    jesus man, don't just guess. have you brought other factors into consideration? Instalation Method? is there a 13a socket on the cooker control unit?
  16. B

    high impact P.V.C. conduit

    what are the precautions when installing long runs of high impact P.V.C. conduit? and why is it better in some cases than galvanised steel conduit plus, what precautions should be observed when running the high impact P.V.C. conduit under ground?
  17. B

    what does SWA stand for?

    could it possibly mean steel wired armour? i really should think sometimes. anyways point and mock at your leisure
  18. B

    what does SWA stand for?

    sorry i'm on about swa cable thanks in advance
  19. B

    Dumb as this may sound but...

    thanks for the help
  20. B

    Dumb as this may sound but...

    i meant the cable termination into the board