Search results

  1. G

    Damp Proof Course Level Replacement Advice Please

    Hi, Silver tape is the existing DPC level (or was) as it was attached to the course of bricks that was removed. You can see the odd header stuck out from the inner skin. Hard to see but level of silver tape is 1.5 bricks down from the path, no possibility to reduce level of path as cannot get...
  2. G

    Damp Proof Course Level Replacement Advice Please

    Hi Appreciate some advice please Side of a double length garage build 1920 ish, probably 15 metres long. Wall is solid brick wall, but not really - never seen this type before, it is two courses bonded with a few odd headers every 7 or 8 courses with a 1-2cm cavity. Due to weathering over...
  3. G

    Building Inspector Left Me a Letter

    I'll also offer them photos, as I suspect they think I'm doing a loft conversion when the only thing up there is a big water tank
  4. G

    Building Inspector Left Me a Letter

    thanks for that suggestion I'll put that in a letter most useful
  5. G

    Building Inspector Left Me a Letter

    I was hoping they could come at a weekend but it seems it must be 9-5
  6. G

    Building Inspector Left Me a Letter

    I got in today to find a letter from the building inspector saying that they wanted to send a surveyor out to inspect the refurbishment I was doing on my house as there had been a complaint. It's sort of out of the blue and there is no detail they want me to call to make an appointment. I...
Back
Top