Search results

  1. M

    New hallway lighting issues

    The 2 blues are your neutrals which the blues on your light go to. The blue wire with brown sleeving is the switched live which goes to the browns of the light The brown stay connected together with no cables from the light connected. The green/yellows go to the green/yellow of the light.
  2. M

    Which cables which?

    Red to A (Live in) Yellow to B (Switched Live/Live out to heating) Blue not required for new stat G/Y not required for new stat Put blue in a terminal block Put G/Y in a terminal block
  3. M

    Does It Really Matter Who Installs Your Boiler ?

    Yes Air Conditioning and Refrigeration, you have to be F-Gas Certified to work on them
  4. M

    Kingspan septic tank not working

    OK, it looks like there could be a fault with the Kingspan box, or a fuse inside the Kingspan box which is blown.
  5. M

    Kingspan septic tank not working

    Have you check the above?
  6. M

    Kingspan septic tank not working

    Could the supply to this DB be controlled by a timeclock or light sensor and only be on at night, as all the other mcbs supply outside lights. It could be that the DB is not powered up at the moment in the daytime. Check if the lights powered off this DB are working at the moment
  7. M

    New workshop

    Window fitted Window fitted by mdbalson posted 28 Sep 2017 at 11:34 AM Doors fitted doors fitted by mdbalson posted 28 Sep 2017 at 11:33 AM Half the floor painted Half the floor painted by mdbalson posted 28 Sep 2017 at 11:37 AM Shelving fitted Shelving fitted by mdbalson posted 28 Sep 2017...
  8. M

    New workshop

    Workshop has 2x DBs (DB3 & 4) fed from DB1 Main DB in House. Workshop DB3 (Fed from DB1, C50A MCB, 10mm supply cable): C40A MCB= DB4 supply C16A MCB= Workshop AC B16A MCB= General Power (1x DSO, 1x FCU for floodlight, 1x SSO for alarm & 1x FCU for AC condense pump) B16A MCB= Freezer B16A RCBO=...
  9. M

    New workshop

    walls finished and electrics going in (About 260 blocks were used for the walls) Walls finished and electrics going in by mdbalson posted 18 Sep 2017 at 6:16 PM IMAG0217 by mdbalson posted 18 Sep 2017 at 6:17 PM Door frame and step going in Door frame and step going in by mdbalson posted 18 Sep...
  10. M

    New workshop

    For storage and general DIY work at the moment. There will be by the workbench about 4x double sockets, 1x 16A Ceeform & 1x 32A Ceeform via a RCD DB fed via a contactor with EM stops to switch off supply to workbench sockets.
  11. M

    New workshop

    Roof nearly done, then finish walls up to roof Roof by mdbalson posted 1 Sep 2017 at 1:01 PM Roof by mdbalson posted 1 Sep 2017 at 1:03 PM Roof by mdbalson posted 1 Sep 2017 at 1:04 PM
  12. M

    New workshop

    Walls up, starting roof Walls up starting roof by mdbalson posted 23 Aug 2017 at 1:22 AM Walls up starting roof by mdbalson posted 23 Aug 2017 at 1:23 AM
  13. M

    New workshop

    Two walls started, bricklaying is not as easy as it looks. Two walls nearly done by mdbalson posted 16 Aug 2017 at 8:46 AM
  14. M

    New workshop

    All power supplies fitted Power feeds all in place by mdbalson posted 14 Aug 2017 at 10:53 PM
  15. M

    New workshop

    Fitting condenser brackets and isolators Mounting the condenser brackets and isolators by mdbalson posted 13 Aug 2017 at 10:45 PM Condenser isolators by mdbalson posted 13 Aug 2017 at 10:47 PM Workshop condenser mounted Workshop condenser in place by mdbalson posted 13 Aug 2017 at 10:51 PM The...
  16. M

    New workshop

    All the shed removed now just the old floor to remove, but rain stops work for today. Old floor by mdbalson posted 9 Aug 2017 at 2:45 PM
  17. M

    New workshop

    My current project this week is to replace the current 27 year old shed, with a new bigger block built workshop. The old shed Outside old shed by mdbalson posted 8 Aug 2017 at 10:04 PM Old shed by mdbalson posted 8 Aug 2017 at 10:02 PM Inside shed Inside of old shed by mdbalson posted 8 Aug...
  18. M

    Summer House A/C

    Finally got around to fitting the A/C in the summer house. (I have had the unit sitting around for around 5 years to fit, since I removed it from a site as it was undersized for the site and they were going to bin it. It all works OK and was only a couple of years old at the time.) Unit is a...
  19. M

    Wiring for AC unit

    Refrigeration pipework is different pipe to normal plumbing pipe, it has a thicker pipewall due to higher pressures being used in the system. You have to have done a F-Gas course to handle Refrigerants, which most plumbers will not have. The pipework has to be pressure tested with OFN to...
  20. M

    Redoing the Shower Room

    Installing Shower Enclosure Finishing wiring for shower room switches Installing Rad pipes and boxing in Mirror wall tiled Tiling window wall Pipes for toilet Pipes for sink...
Back
Top