Search results

  1. D

    WUFH, Cracks in the screed

    Hi, I have a new extension built, made wind and water tight end of November. The Plumbers installed pipes on the insulation using plastic 'egg box forms to hold the pipes. 100mm screed was laid on top and I was told it would be 4-5 weeks before the heating could be turned on, which meant the...
Back
Top