Search results

  1. David9899

    Tieing a new engineering brick pier into existing brickwork - issues

    Hi All, Ive been using the answers from this forum for some time and its invaluable. Q I am to remove (done) a 400mm column of existing brickwork, internal wall but was previously external and is certainly load bearing, and replace with 330mm minimum of new engineering brick pier. The problem...
Back
Top