The building inspector has told me i need to protect the drain running through the footings iv dug before pouring the concrete. Can anyone explain the procedure ?
hi
i am installing some spindles which need reducing in size as they go up the stairs as they finish under the ceiling. I have chosen some that are fairly plain to avoid problems with the profiles but what is the best way to reduce them in size ?