Hi
Apolgies beforehand if this is a stupid question.
I've been replacing some of the waste pipe in my bathroom (2"/50mm) used the push together fittings with solvent. All done no probs!
The waste pipe on my shower is 1.5"/40mm so i've put a 50mm-40mm reducer into the T piece i fitted...
Hi
How long should i leave my newly skimmed walls in the bathroom before tiling? Just till the plaster colour of the plaster changes or longer?
Also should i apply a sealant e.g. PVA (Diluted??) to seal the walls before tiling.
Cheers
Stu