hi, hope someone can give me advice re new boiler installation.
pipework from meter to boiler has been run in 22mm copper. meter is sited on the gable of building in a wall box and pipework has been run @ 2m horizontally them 90bend, followed by @ 5m vertically, then into boiler. pipework is...