Search results

  1. A

    Loft Conversion Fire resistance

    The ceiling is made up of 9.5 mm plasterboard which does not give the 30 min fire rating by adding 100mm of rockwool on chicken wire the ceiling will comply with regs
  2. A

    Rockwool Flexi 400mm wide

    Does anybody know where I can get 100mm Rockwool Flexi 400mm wide Best Regards A Steyert :lol:
  3. A

    Loft Conversion Fire resistance

    Thanks for that Rockwool have said 100mm flexi expensive but safe BC will not visit untill the first inspection stage pre plaster due to staff cuts they will give advice but will not be specific .To give you an idea of the cuts they only have two agency Structual Engineers working two days a...
  4. A

    Loft Conversion Fire resistance

    Thanks for that bc do not want to know will not visit site and are reluctant to give advice .I have submitted a full plans applicationwhich has been passed the first visit is not until the pre plaster stage which is too late if things are not in compliance they specify rockwool but will not say...
  5. A

    Loft Conversion Fire resistance

    The new floor is suppoted on steels as the existing ceiling has bowed over the years Rockwool has been specified by BC they will not accept mieral wool do not want to underline as will ruin decor :wink:
  6. A

    Loft Conversion Fire resistance

    I am doing a Loft conversion. the new loft floor is 7x3 joists set 3 ins above the existing ceiling, which is underlined with 9.5mm plasterboard. The fire retardent mat between the joists will be 100mm rockwool flexi. As the new joists are above the old ceiling does the mat sit directley...
  7. A

    shower tray

    yes understood Thanks
  8. A

    shower tray

    I am fitting a new shower tray i my new bathroom .It will be tiled on the walls and floor .The new tray stands on plastic feet i am worried about the tray flexing then leaking down between the tray and the tiles.Would it be possible to bed this tray on morter or tile cement ? :roll:
  9. A

    Purlin Move

    no the rafters are not birdmouthed just nailed :lol:
  10. A

    Purlin Move

    I am looking at repositioning a purlin in my bungalow loft .One of the purlins is 2m from the ridge and the other is 2.3m from the ridge. The one that is 2.3m i will replace it with a new purlin 2m from the ridge to give equal head hieght on both sides of the loft The idea is to install the new...
  11. A

    Pipe Run

    The 22mm circulating pipes on my 30kw worchester boiler run from my garage through the loft of my bungalow for 12m down the kitchen wall for 3m then under the floor back towards the boiler for 8 m and end up just 4 m from the boiler . I am considering re plumbing these pipes and re feeding them...
  12. A

    PREPARATION OF WALLS

    thats great thanks :lol:
  13. A

    PREPARATION OF WALLS

    I have just removed the plaster and backing of my bathroom wall it was blown .Before I put on the bonding coat should i coat the wall with PVA if so how long befoe plastering can this be done :shock:
  14. A

    purlins

    yes but as the roof needs replacing i think it will be better to do it with the roof off
  15. A

    cold walls

    Thanks for that :D
  16. A

    cold walls

    I have a 1957 Bungalow the walls between the bedrooms and the garage are single brick which make the bedrooms cold .Can anybody suguest the best method to inprove the insulation on these walls. ie kingspan on the garage side
  17. A

    purlins

    Thanks for that Guys would it be possible to do with the roof in place if i don't change the tiles
  18. A

    purlins

    I am about to do a loft conversion the inner purlins are not the same distance from the ridge and one is lower than the other this will cause a problem with head height .The purlins are also in three sections each one about 12 feet in length and propped on the joints.I would like to change them...
Back