    Tiling on New Concrete Floor

    New concrete floor poured in our extension today (kitchen and sunroom). Builder has tiler lined up for one week's time. Is this sufficient time for the floor to dry out before fitting tiles (polished porcelain). Thanks in advance.
  2. O

    Help - Finish to pillars

    We are doing an extension above our garage which extends beyond the gable garage wall by 1m with three pillars forming a walkway. In the initial drawings the architect instructed that these pillars would be done in red brick to match the existing house. Yesterday we found that the...
  3. O

    Velux windows on a 12 Degree Pitched Roof

    We are currently doing an extension with drawings suggesting a normal Velux GGL Window. The Builder and Architect have now said the strictly correct solution is to install the Velux flat Roof System, which we believe will be very unsightly particlarly from the upstairs windows. I have been...