My PME supply has 25mm tails to a fused isolator, then 16mm T&E to the CU.
The 16mm earth goes from DNO to inside the fused isolator where a taped up connector joins the 16mm earth to the CU and the 10mm gas bond. The earth in the 16mm T&E is not connected in the isolator but is at the CU.
The...