Hey, Iv'e got a problem with my downstairs rads and have an idea which I'd like your comments on.
My house was built in the sixties and all downstairs pipe work is in a concrete screed, it leaves and returns to the boiler in 3/4 pipework and enters the rads out of the floor screed in 1/2 inch...