OK, saying that makes me go off and check in more detail...
The shower is not on the ring. There are 3 circuits in the extension: lights, ring, shower. It's only 3 small rooms, so no separate up/down circuits.
I have looked up close and there's a SQOE063030, which is a RCCB in the extension CU...