    Garden - Time to start again

    After a bit of battling with the nettles and weeds I think I am finally getting back to a blank canvas! I also found a rather large concrete post with the concrete base attached, after an hour of digging and using 2 fence posts to lever it out of the hole I won! I now want to add a path...
  2. Untitled

    Untitled

  3. N

    Garden - Time to start again

    yes im in Wales, i have never hered of this 300mm rule, sounds a tad harsh. I notice a few of my neighbours have added rased paio areas / decks....im sure it will be fine. no one can see in anyway lol
  4. N

    Garden - Time to start again

    no the decks done yet exist.....although when i open my patio door there is a foot foot drop so they are required....lol
  5. N

    Garden - Time to start again

    From the level of my garden or my neighbors? The neighbor’s garden is 2 foot higher than mine; they also paid for the materials and ordered the posts / boards in this length as we agreed it was a decent height for the both of us. They paid i fitted.....not a bad deal all round.
  6. N

    Garden - Time to start again

    Fence 1 complete! A view fron the neighbours garden: Now to start a small fence on the opposite boundary and a balcony / deck to cover the useless 4 tiers I have next to the old brick steps.
  7. Untitled

    Untitled

  8. Untitled

    Untitled

  9. N

    Garden - Time to start again

    After trying to keep the cross-beams level, then trying to keep the same slope as the wall it looked awful so i decided to step each section to suit:
  10. Untitled

    Untitled

  11. Untitled

    Untitled

  12. N

    painting above a single story extension.

    thats not a bad idea, may just be an option there.
  13. N

    Garden - Time to start again

    My 1st job was to fit a 10.7m fence along the side wall of the garden. As the neighbors’ garden is 2 foot higher than mine I used 10m posts 2foot in the ground, 2 foot against the wall and 6 foot above the wall. The posts are 1.8m apart, as you may see I need to add 1 more post next to the...
  14. Untitled

    Untitled

  15. N

    Garden - Time to start again

    After Clearing the garden, then leaving it for too long I am back to square 1! Oh well time to start again, below is what I want to acheive: What do you think? Would you change anything or do you have any ideas that could improve the garden....
  16. Untitled

    Untitled

  17. N

    painting above a single story extension.

    Hi all, I decided to paint the rear and side of the house in white as the previous owner had painted a horrid yellow. I have finished the rear however i have a problem. The side of the house has a single story extension (sloped roof) while standing on the roof i have done as much as i can...
  18. N

    Storm Drain Problem

    It fills up pretty quickly, but if it stops raining it does seem to drain by the following day. To be honest I think that when the bypass was built behind the house (way before my time) the site the bypass is located is exactly where the excess water would have run and drained!
  19. N

    Storm Drain Problem

    The storm drain issue was discussed, however i think i am going to leave the drain well alone and try and do the garden to suit (hence the new post) I can’t take any pics from the other side of the fence as i have no access, there is a banking leading away to a dual carriageway (all much lower...
  20. N

    Storm Drain Problem

    The bottom of the rear wooden fence is roughly half a meter higher than the surface of the garden; this is however secured on to an old Concrete slat style fence that starts at the surface of the garden. As you can see next doors garden is also around half a meter higher than mine as is the...