Search results

  1. T

    Underfloor Central Heating

    8 of Screed Sand x 1 of Cement
  2. T

    UFH Help!

    Screed will take about 1mm/2mm per day to dry, leave it to cure naturally. Never use the UFH to dry out screed, this would only have an adverse effect. Only when the screed has fully dried out do you then turn on the UFH. Start with water temperature at 25°c, topping up 2°c up daily, till...
  3. T

    Underfloor Central Heating

    Two options Aluminium Heat Emission Plates or Screed Infill. Both options require insulation. The heat emission plates are pre-channelled ready to hold the pipe, fitted with no air gaps underneath. Lay a thin layer of mineral wool, filling the gap, between the plates and polystyrene...
  4. T

    Underfloor heating

    What is the ²m of your kitchen, maybe this may be the answer, please click on the link below http://www.uponoruk.mobi/small_area_pack_56.php
  5. T

    underfloor heating cold rooms

    If 1 out of 3 loops is working then it is possible 2 of the actuators are not opening. Replace actuators if needed If all 3 actuators are opening then there is a possibly of air in the 2 other loops. These will need purging.
  6. T

    Uponor underfloor heating installation

    Uponor, in the past, did offer UFH small area packs designed from 14²m upwards. Today they still offer the SAP of 14²m, incorporating the Danfoss FHV-R valve, for installation guides please click on the link below, http://www.uponoruk.mobi/small_area_pack_56.php For SAP areas Uponor...