Search results

  1. F

    Drying out new concrete floors

    Can anyone advise on a realistic time for the drying of a new concrete floor before laying laminate boards. I have searched on the web and the general opinion seems to be 1 inch per month, or 1mm per day. However, I have also seen conflicting advice which suggests that this is a an old rule...
  2. F

    Cracks following removal of a wall

    Hello, Our builder has this week removed a single skin internal 3m long brick wall in our kitchen which supports one of the bathroom walls above. The ceiling joists (both 1st floor and loft) run parallel to the wall. A huge steel lintel has been inserted, using props. The problem I have is...
Back
Top