Confused now gents. I have a digger turning up tomorrow to excavate the ground. A firm that a doing a drive at the end if my culdesac said I only need to go down 6inches, add about 3 1/2 inches of sub base then 1/2 inch of sand.
They also said type 1 mot is not necessary. They are using...