Search results

  1. C

    Consumer equipment inside the Meter Box

    I have a project where I need to split the existing tails between the meter and the consumer unit so that the tails also feed a switch / fuse to an outdoor building. To separate the meter tails to supply the existing CU AND new switch/fuse I need to add a pair of Henley blocks. I have it in...
  2. C

    One outdoor buried supply to two log cabins.

    My summer project is to build two large log cabins at the bottom of my garden. They are separated by a couple of metres. One is for use as a workshop / storage and the other for leisure / home office use. I am planning on burying a 3 core 10mm2 SWA cable about 600mm under the mainly grass...
Back
Top