  1. M

    Electricians's documentation?

    Could anyone help me please? Is there any documentation an electrician should sign when the whole job is finished - recessed low voltage lights & sockets in kitchen? If I ever wanted to change to mains voltage recessed lights would an electrician use the same cabling or would he have to run new...
  2. M

    Devimat

    I know - he is supposed to be! Is there any documentation he should sign when the whole job is finished - recessed low voltage lights & sockets in kitchen? If I ever wanted to change to mains voltage recessed lights would an electrician use the same cabling or would he have to run new? They are...
  3. M

    Devimat

    Thank you breezer. I can't understand why my electrician didn't do that. When I asked how he had teseted it he said he had turned it on and it worked. I hope he will sign the Guarantee document! Thanks for your time. marliz
  4. M

    Installing a Devimat underfloor heating mat

    __________________________ moderator please do not start a new post to continue with the same question
  5. M

    Devimat

    I am battling with my Devimat which is to be laid onto a concrete floor. The instructions are far from clear. I understand about the chanel for the floor sensor, but what about the cable from the mat up to the thermostat? Do I just get the tiler to bury this in his tile adhesive or what. I am...
  6. M

    circuit breaker

    Hi, I asked my electrician to put in some downlighter, remove some socket and retain others. Because he know there have been problems in other areas of the house he decided to rip out all cables to start afresh. But now I have had to delay plasterers, tilers and cooker delivery because he is...
  7. M

    circuit breaker

    Many thanks for your replies. Now I am sure it is an MCB the electrician cannot tell me I need an MCB and rip me off. Thanks again. marliz.
  8. M

    circuit breaker

    After reading about MCB\\\'s on forum could someone please let me know if the following is an MCB or a \\\'more or less de facto standard for old CU\\\'s\\\'. My electrician wants to alter our boards, but I want to understand what he is doing BEFORE he begins, not after he has been paid. Any...