Hi all
I'm in the process of replacing the old lead pipe with MDPE. I have laid 32mm MDPE, which splits off at the property to feed two 25mm MDPE.
My query is...how do I connect to the old mains valve at the end of the drive? I have Googled various things and have looked at various Philmac...