Hi woody, so the block walls make up the 1st metre of 2 of the walls then using wall ties I built the other 2 walls from the base of the concrete pad, it is at this height where the issue is (although I have built another 1m on all 4 sides).
I then preped and tanked the interior on all 4 sides...