Search results

  1. S

    Main Supply Isolator Switch (REC Switch)

    Hi there. I've got a simple question about isolator switches like this Wylex 100A one. Their datasheet says: "It’s safer because the supply tails are fixed and finalised in a sealed unit – instead of being left hanging loose ready to connect to the meter." but their diagram shows it between...
  2. S

    Demolition cost inconsistent

    Hi everyone. Sorry if this comes across as quote checking, but I have had some inconsistency from the demolition supplier that makes me worry I am far off market rate. Last year I got a budgetary estimate for demolition of the following: - demo and removal of 4bed bungalow (85sq.m.) asbestos...
  3. S

    Site electricity during replacement build

    Hi all. We've had permission for a new build house and detached workshop. The house overlaps slightly with a bungalow that we need to demolish. For the demolition notice we need to say what we'll do about services. Water is easy as we'll disconnect the bungalow and setup a stand pipe...
  4. S

    Drainage field (soakaway) question

    New to the forums so hello. I hoped someone in the know could please help me with what is probably a simple question. I'm working out how much space I need for the drainage field of a new build and wondered what constitutes the drainage field area. Part H helps you work out the area needed but...