Search results

  1. I

    5m x 3m Block Shed

    Thanks Mr Chibs, i was thinking 1m foundations based on some bits i had read. I will do some research on external insulation and cladding as a good idea and give an update when i have a plan. Thanks again
  2. I

    5m x 3m Block Shed

    I currently have a wood shed that is rotten and housing a few rats which are slowly chewing through my possessions so plan to replace with a block/brick version 5m x 3m which i can split into two sections, one side for shed and larger side for an office. The area proposed has a few small trees...
  3. I

    Worcester Greenstar 24RI with Honeywell Sundial Programmer

    Thank again Stem, the control panel is easily excissible and is right by one of the pumps so i will turn of the electic and have a lok inside and see whats wired to what. If wired correctly i will drop an email to worcester and see what they say. Thanks for the help
  4. I

    Worcester Greenstar 24RI with Honeywell Sundial Programmer

    Thanks Stem for the information. But surely the stat switching off the boiler when the set heat is reached is no different to the Boiler switching off at the set time like with my old controller?. Surely the pump overrun must be required because the water in the pipes and boiler is still hot so...
  5. I

    Worcester Greenstar 24RI with Honeywell Sundial Programmer

    Hi all, I had a new boiler (Worcester Greenstar 24RI) fitted about 5 years ago when I had an extension built which replaced on old Potterton boiler. The old Programmer was moved across which was a Honeywell ST6400. I bought a few years back a Honeywell Sundial Pack 2 which has the added...
Back
Top