  1. J

    Advice for underground cables

    Thanks Jadele, really useful reply.
  2. J

    Advice for underground cables

    Sure, it is 2” flexible pipe running underground beneath soil and gravel. It will carry 240 volt AC, and 12/24 v DC cables and exists at ground level. Will supply a water feature and a outside shed.
  3. J

    Advice for underground cables

    240v AC, plus 12 and 24 v DC
  4. J

    Advice for underground cables

    Correct, then both low voltage.
  5. J

    Advice for underground cables

    OK thanks, I was hoping that there would be something smaller!
  6. J

    Advice for underground cables

    There will be two 2" and 4" round pipe.
  7. J

    Advice for underground cables

    I need someone to point me in the right direction for the right equipment to allow electrical cables (low and domestic voltage) to exit neatly from underground runs. Maximum cable bunches will be 3-4 and it seems overkill using a man hole and chamber, but no matter how much I search I cannot...
  8. J

    Yale COnexis and Rockdoor

    Has anyone successfully fitted a Yale Conexis to a rock door please?
  9. J

    How best to approach an underground chamber.

    Main reason is to allow a four inch drain to server a bottom drain, which will gravity feed a filter unit. Pumped solutions tend to liquidise sediment etc making filtration more difficult and leading to cloudier water. A four inch pipe and a bottom drain with a seive can cope with solids that...
  10. J

    Question about what to expect from directly employer labourers

    Great feedback, thanks guys.
  11. J

    How best to approach an underground chamber.

    Appreciate your advice.
  12. J

    Cheapest driveways ....

    For professional block paving allow £75-£100 per sqm. If using gravel then use a gravel retention system (honeycomb grid), cheap and salvoes many gravel issues.
  13. J

    Question about what to expect from directly employer labourers

    I am about to embark on a large garden pond project and wondered whether someone could let me know what of the following would be reasonable to expect general labourers to perform / have experience of doing: 1 - Concrete laying 2 - Rebar fitting 3 - Block walling 4 - Mini digger operation 5 -...
  14. J

    How best to approach an underground chamber.

    Useful reply, thank you. If I employ general labourers would it be reasonable to expect them to know how to do this properly?
  15. J

    How best to approach an underground chamber.

    I need to dig out a chamber for pond filter equipment approx 1 metre deep, 3 metres across and 2 metres wide. How should I best finish the job. My very limited (read non existent) building knowledge says that I can line and floor with breeze blocks and simple add one layer of breeze blocks to...
  16. J

    Pond excavation

    Thanks for the reply. I am only using concrete for the bottom drain fitting - The pond will be liner. If I was using blocking and walls, it would be much simpler!
  17. J

    Pond excavation

    Some advice please - If I am digging out a pond - say 42" deep, and want to put a bottom drain in, then I need a channeller the 4" pipe that will go to the filter area. The channel will be six inches wide to take this four inch pipe and will sit from the middle of the pond to a location about 3...