Concrete being laid is 4 inches, the pipe is sitting at the same level as the prepared ground, pipe runs to a soak away however the pipe is only barely covered as it crosses the lawn.
I understood it would be laid with a bottom outlet to get some depth for the pipework, however it has been laid...