Hi all, new here.
I’m having the back of my house rendered and want to tidy up the waste pipe work before and after.
Currently both 1st floor sink and bathroom waste pipes go into a cast iron hopper and from there down to the gully in 2 1/2” caste iron? This is close enough to the new (ish)...