Hey Dazlight,
I want to put down a layer of floating click LVT (built in underlay), I’ve taken up my current laminate to be met with asphalt. It’s slightly cracked round the edges of the room.
What should I do? Should I lay 1mm sheet LVT underlay on top or put a self levelling down?