Thanks a lot for the detailed replies, I think I now understand! Plan is to fit a new, higher, F&E tank in the loft to allow rads in the loft, replace whole ground floor with UFH and leave 1st floor as rads. Will remove existing vented cylinder and cold tank and replace with megaflow or similar...