If i were to use manifolds, the manifold at the end of the 22mm flow pipe with 4 10mm outs would feed 4 rads. 3 of these would be within 3 metres, another would be within 4 - 5 metres. what do you think?
Alternatively I could lay 22mm and 15mm under the floor and then reduce further to 10mm...