    New concrete floor drying time

    Thanks very much, I will let you know how I get on. Mike
  2. E

    New concrete floor drying time

    I am not going to tackle the Amtico myself I have a flooring fitter who is going to do it for me. He is coming over next week to have a look as I have part old t&g and part new concrete floor. I have to say it is V frustrating as I want to get on and fit the kitchen (and get a template done for...
  3. E

    New concrete floor drying time

    Thanks for the advice, I want to get it right as I want to have Amtico laid once the floor is dry and do not want troubles later on. Is the best way to test the floor moisture content to hire a meter from a hire shop? Cheers Mike
  4. E

    New concrete floor drying time

    I have a new approx 4" thick concrete floor (3 weeks old) and am getting grief from my good lady wife about the time required for the floor to dry (1" per month!!!) I do not want to do the final fit on the kitchen until I have the final floor level (ply over floorboards and acrylic / water based...
  5. E

    Cable required 10.7KW hob

    Many thanks RobFurn, it is just a hob on its own. Will run 10mm now. I was just hoping it would be OK to save the time and £££.
  6. E

    Cable required 10.7KW hob

    Just in process of changing over the kitchen (part new extension) and have an existing 6mm cable to the hob, but have a new hob which has a rating of 10.7kw. The cable is buried under concrete but is in a conduit, I am thinking the 6mm cable will be a bit on the light side, am I correct. I do...
  7. E

    Installation gap fridge freezer

    I am installing a Hotpoint FFA47X fridge freezer between two full height larder cupboards and do not want to leave a big gap either side of the fridge freezer, can anyone tell me what is the minimum gap to each side. There is a good 24" above for ventilation. Many thanks Mike