    Limits of a special location - 701.32.1

    Yes the cubicle/door are just your regular glass affair but I would say this is still a permanent partition/door regardless of the material ? What would the difference be if they were plaster and timber ? The door would still open into the bedroom ?
  2. D

    Limits of a special location - 701.32.1

    The door is taken account of in the above regulation as being one of" floors, door, wall, partition etc", and the preceding text of the reg states the zones apply when the bath or shower basin is in it's usable configuration (i.e. door closed) Yes judgement call as open to interpretation its...
  3. D

    Limits of a special location - 701.32.1

    The example diags in 701 all only show one fixed partition and so zones 1&2 apply, not a location surrounded by partitions as in the case in question
  4. D

    Limits of a special location - 701.32.1

    Guys I'm not disagreeing with you, just that if the regs state that the cubicle is effectively the extent of the location and it's zones, , then I cant code it any more than C3 - and the only viable solution (given that it is a bedroom without capability of 3m distance to sockets - like that...
  5. D

    Limits of a special location - 701.32.1

    Hmm thanks - so it does - never noticed that before. Interesting how the OSG talks about complying with requirements of bathrooms and shower rooms for shower cubicles in other room, which goes against the actual regs definition/wording of "locations" - conflicting as there are no requirements...
  6. D

    Limits of a special location - 701.32.1

    On an EICR I discovered a bedroom that had a small shower cubicle installed in the corner of a bedroom. The shower screen and shower door fully enclosed the shower. The screen was 2.25M high. The adjacent walls in the corner of the bedroom completed the cubicle. There are sockets in the...
  7. D

    Maximum Demand for a church

    As said I have advised he contacts EON, and instructs a commercial electrical company. I will be interested to see how it evolves and keep you posted. Thanks for the help provided. Also be interested if someone can quote with evidence that a TP100A switch is rated above 100A ! (and also what...
  8. D

    Maximum Demand for a church

    Yes sorry missed that, what is the rated switching current of a TP&N 100A switch ? Is it ascertained from the BS number ?
  9. D

    Maximum Demand for a church

    So out of interest, what are some examples of such things that are essential , that I dont know or havent asked ? I have advised the builder to ask EON for advice, clearly I have not enough experience of commercial installations, however, it appears from the helpful comments that a 63A TP OCD...
  10. D

    Maximum Demand for a church

    So out of interest, what are some examples of such things that are essential , that I dont know or havent asked ? I have advised the builder to ask EON for advice, clearly I have not enough experience of commercial installations, however, it appears from the helpful comments that a 63A TP OCD...
  11. D

    Maximum Demand for a church

    Ah I see if its a 100A Triple pole then thats rated at 100A per phase ? Reason didnt intend to install a TP&N sub board was that it would need to be something like an 80A braker from the mainboard, which I dont think are available ?!
  12. D

    Maximum Demand for a church

    Thanks for response and help..replies below. Yes but the CU will not be rated at 300A..the main switch is 100A for example, and although this could be changed the rating of the existing TPN board would not be 300A ? Yes they are Yes, sort of..,I meant supply 3 small DB's from the...
  13. D

    Maximum Demand for a church

    A builder has asked me to look at a kitchen refurb he is doing at a church. In the new kitchen there will be a 6KW water heater for the sink, a 6KW tea making machine, 3 x 3KW plinth heaters, and a 6KW water boiler/cofee machine. Along with the usual lighting and sockets there is a 4.7Kw...
  14. D

    HF Intermittent lights

    Scenario is 4 double and 2 single flourescent light box fittings in a suspended ceiling. The lamps are PLL 4 PIN COL840 55W. (240V) They are all fed from one gang of a standard 4 gand light switch. They intermittently stay off, come on or flicker together. Would you suggest it is the...
  15. D

    In between self levelling depth and screed

    I need to Level a concrete floor in a room I have knocked through into up to 25-30mm which seems to be in between screed and levelling compound. Any ideas ? could I build up with say 20mm plywood screwed to concrete and level over that ? Could I build up with some form of insulation ...
  16. D

    Things that make ya go hmmmm . . .

    What is up with 240V on a tree ??
  17. D

    BT Versatility wizard

    Do you need me to resend or did you find it ? I need the s/w desperately, like today if poss, happy to pay !
  18. D

    BT Versatility wizard

    I sent one...!
  19. D

    BT Versatility wizard

    Hi does anyone have a copy of the above software ? Doesnt have to be the very latest version but would like to connect to a system I am trying to configure Thanks
  20. D

    BT Versatility Music on Hold

    Thanks for recent posts, most helpful. I assume the courtesy service is for incoming calls to the system i.e. before being answered by the receptionist, and on hold for after being answered but while being put through to an extension, or just being put on hold whilst waiting for an extension...