    Joint filling

    Here's a stupid question to save me money.... Can I use the Plasterboard adhevise as a joint filler? What difference will it make between that and the named filler. All I can see is I will need to go out and spend more money when I have plenty adhesive. Regards Adrian
  2. I

    Polythene on top of new screed

    Hi All, Ho long should I leave the polythene on top of newly laid screed? I have left it 4 days now......ist that long enough or does it need longer? Adrian
  3. I

    Floor Screeding - Question 2

    Hi All, A second question concerning screeding my floor. The area is about 15m2 @ 65mm thickness. What will the impact if I cannot complete the job in a day and need to spread the work into two days? I decided to do the work myself as all quotes I have for completion are 2 man/1 day...
  4. I

    Screed Floor and Insulation Upstand

    About to lay a screed floor and have read I need to put an insulation upstand around the perimeter of the screed floor. Is this really necessary? The screed floor is 65mm so I will need to place a strip of 65mm x 20mm insulation around the room. Is there a place I can buy this in strip form...
  5. I

    Boiler Replacement

    Hi All, We have a failed circuit board on the temperature selector ofour boiler - a Glow-Wormm Fuelsaver MkII. Since this is 25 years old, it's not worth repairing. Can anyone recommend a suitable replacement boiler for me to purchase for my engineer to install? House is essentially 6...
  6. I

    Gas Central Heating Problems

    Can anyone give advice on this issue: Just moved into a house recently, Gas Central Heating programmed to come on at 6am to 8am and 6pm to 10pm. It comes on in the morning okay. It comes on in the evening okay and switches off at 8pm. If I set it to on (manual on) after this period, it does not...