he did say he would have to do something with the pipes, said the pipes have to be made up to 22mm, someone has put 15mm pipes in, he said they should have been 22mm for the the first meter leading from the flowmatic 20 - 80.
he said it total more than 850.00 with some extra pipework.
he...