Moving WC/waste in bathroom.
We’ve unearthed and cut back the soil pipe as required. In doing so we’ve removed the DPM back to the edge of our trench (about 30 x 60cm). I’m concerned we should make good the DPM. I've considered removing more floor to expose good DPM so we can patch it somehow...