moisture content

  1. P

    installation of click LVT floor on a self levelling anhydrite screed - precautions

    We are having our 1990 built bungalow extended and renovated. The new 150mm concrete subfloor was laid in October. The existing floor was stripped back to the concrete subfloor. The subfloor was lined with VCL with 75mm Celotex on the new subfloor and 40mm on the existing. Underfloor...
Back
Top