mot-type-1 subbase driveway

  1. S

    Spreading 55 tonne of MOT type 1/Crusher run

    I've just had 10 grab lorries worth of muck removed from my driveway in order to level and landscape it. After retaining walls have been built i'll have to build the sub-base up with a layer of 150mm of type 1 or crusher run. I've been pondering the best way of doing this as i'll need approx 55...
Back
Top