new concrete

  1. N

    What length of time should I leave my concrete

    Hi all! I've recently ripped up the slabs in my open fronted porch. I've put down a dpm and laid my concrete at 100mm. I'm in need of applying self leveler ready for the tiles which isn't a problem being a tiler I've done this many times however never laid concrete and I'm unsure of the curing...
  2. ajmetro

    Self levelling compound over polyethylene paint

    Hello everyone, There is no mention specifically about SLC over polyethylene paints. The general consensus of leveling over paint is a no no as the adhesion is not there. I have a large area of floor that needs levelling out slightly to get rid of the ridges in the laid concrete. The concrete...
Back
Top