What length of time should I leave my concrete

Joined
12 Oct 2021
Messages
1
Reaction score
0
Country
United Kingdom
Hi all!
I've recently ripped up the slabs in my open fronted porch. I've put down a dpm and laid my concrete at 100mm. I'm in need of applying self leveler ready for the tiles which isn't a problem being a tiler I've done this many times however never laid concrete and I'm unsure of the curing time some conflicting information out there.
Any info would be much appreciated
 
Sponsored Links
My guess would be lay a square of plastic down overnight - if you lift it and there’s a wet square….it’s still too wet.
 
Sponsored Links
Back
Top