  1. R

    Advise on plumbing and electrics before underfloor heating..

    Hey guys, I'm going to be installing underfloor heating with 10cm insulation, topped off with a 5cm screed. The area is just over 35sqm and will have a kitchen, so there will be electrics, water supply and a drain installed. For the drain to work, it obviously needs to be at a slope. The...
  2. J

    Network Cable in conduit under screed

    I am building an extension which is going to have a multi-media cinema and will require a large amount of network cabling. Do regulations on running cable through conduit under screed apply to low voltage network cable? I would ideally like to bury some flexible (non metallic) conduit under...
  3. D

    Screed Drying for Engineered Flooring

    Hi - could I source your thoughts on concrete drying times suitable for flooring? We've replaced a ground froor slab (44m2) with a DPM, 6" concrete, 100mm kingspan, and 65mm Anhidrite Screed containing a wet loop underfloor heating system. The Screed pour went in 33 days ago, followed by...
  4. G

    Floor Leveling after removing tiles

    I have removed some seriously ugly and thick floor tiles for my kitchen - area 4metres by 9 metres. This has left the adhesive behind in 'blobs' with multiple holes etc. I want to put down vinyl and need to level the floor, the current situation leaves me with level changes of 5mm plus and the...