    Shed gym on type 1

    Good afternoon all, I have a Mercia 4mx3m shed being delivered in a couple of days. I have dug down and put in a type 1 pad for the shed to sit on. It was compacted in stages and there’s around 4t used for the base itself. Am I okay putting the shed on slabs to raise it? I have some wood that...
  2. P

    laying patio subbase over a gravel trench

    I'm extending an existing patio in heavy clay soil. I've dug out the new area of 2x3m but between this and the existing patio is a trench of gravel (pea shingle), about 200mm below the patio level. The gravel fill itself is 2m long (the short length of the new dig out), 400mm wide and about...
  3. D

    Hardcore Sub Base for gravel path

    I have had some useful responses on the height of a gravel path which I am building alongside my house. Below the gravel path I want to put a hardcore sub base as that is what has been suggested. However I am too tight to buy a load of hardcore as I have lots of rubble/gravel/old cement and...