3 CU's

Joined
28 Jul 2009
Messages
12,456
Reaction score
1,759
Location
Kent
Country
United Kingdom
A little jem today, I was out the front loading the car and a started chatting with neighbour as they passed, They have been quoted £2½K to 'sort out' their 3 CU's (main house, granny annex & garage) following a fault.
A Merlin MCB tripped on overload (Damaged mower cable) and now mechanically challenged, the called out lectric guy (insurance service) has said the board needs replacing as 'MCB's not available' but also fed incorrectly - 16mm² tails feed first board then T&E looped round to the other 2 boards without further switch gear or protection.

I have put a SH Merlin MCB in (the insurance service is only a safety service), Other than adding a fused switch to feed the remote boards I don't see any issues.
 
I was looking at the fees charged, although what is changed it not what is paid, I know 1985 my time charged out at £25 per hour, but I was not paid anywhere near that fee, it was all down to the cost of getting us there, and accommodating us while there, so maybe Kent is some third world area like Algeria, where no one wants to go to work?
 

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top