the cost to the tax payer for a feasibility study to build a bridge or tunnel between Scotland and Ireland
apparently a bridge would cost 335 billion and a tunnel 209 billion
apparently beufords dyke an under water trench on the most direct route would need to be carefully surveyed due to a million tons of in exploded munitions being dumped there