Morning all,
as part of my bathroom revovation, Ive decided to fit new wastes, the old ones were regulary slow to drain/blocked.
Questions.
1 - what gradient should i put on the pipes?
2 - should i run 3 seperate pipes, or join say the bath and shower, or join all 3?
3 - I read somewhere that you shouldnt run a pipe for more than 2m, however the shower will need at least a 3m run, is there anything i can do to make this drain easier? or overcome this problem.
4- When joining the pipes, do i need to use anything on the joins? silicon? somekind of jointing compound if so which is best/
5- Any other considerations i should make before tackling this.
Cheers
Andy
as part of my bathroom revovation, Ive decided to fit new wastes, the old ones were regulary slow to drain/blocked.
Questions.
1 - what gradient should i put on the pipes?
2 - should i run 3 seperate pipes, or join say the bath and shower, or join all 3?
3 - I read somewhere that you shouldnt run a pipe for more than 2m, however the shower will need at least a 3m run, is there anything i can do to make this drain easier? or overcome this problem.
4- When joining the pipes, do i need to use anything on the joins? silicon? somekind of jointing compound if so which is best/
5- Any other considerations i should make before tackling this.
Cheers
Andy
