The client doesn't have a stop cock in the house, they use the outside master stop cock.
The mains supply all the way to the kitchen is all in lead and they won't be changing it any time soon
.
So am I OK with bonding to lead? and positioning the bonding under a front bay floor where the lead mains comes in to the property. Lead does oxidize pretty quickly so wouldn't that also be an issue?
Is a standard earth clamp the best for the job or is there something that will make a sweeter contact and not squeeze the soft pipe too much.
As always, thanks.