We're removing a chimney breast, and have to extend a joist that is resting on one side of the ground floor breast. The gap is about 1.5m, so was going to get hold of a 2.5-3.0m joist, line it up next to the existing one overlapping by 0.5-0.75m at each end, drill through both joists and bolt together.
Is it as simple as that? I'm comfortable enough with a drill and bolts so I'm happy I could get them in place and attached, but if it's not 100% tight and in line am I going to regret not paying someone to do it? Had a guy round for a quote but not had the price back yet, and I'm looking to get it done before the start of next week.
Thanks for any help,
Is it as simple as that? I'm comfortable enough with a drill and bolts so I'm happy I could get them in place and attached, but if it's not 100% tight and in line am I going to regret not paying someone to do it? Had a guy round for a quote but not had the price back yet, and I'm looking to get it done before the start of next week.