I want to update our bathroom and take down the wall between it and the toilet to provide space for a shower.
Apart from the electrical Part P requirements, is there any requirement to notify Building Control?
The wall between the bathroom and toilet is a stud wall and non-load bearing. A shower will be added and the existing bath, basin and toilet will be replaced and moved around within the new area and the existing toilet door will be filled in with studwork and plasterboard.
The drainage system externally will not be altered.
Richard
Apart from the electrical Part P requirements, is there any requirement to notify Building Control?
The wall between the bathroom and toilet is a stud wall and non-load bearing. A shower will be added and the existing bath, basin and toilet will be replaced and moved around within the new area and the existing toilet door will be filled in with studwork and plasterboard.
The drainage system externally will not be altered.
Richard