Hi - just had to take a loft ceiling out (long story as to why) and it was 3x2 joists. I'm going to put it back in with 4x2 - does the 4x2 need to be graded (to c16) or can it be ungraded? It'll be supported from a pitched roof with 4x2 rafters, span from front rafter to rear ~ 3.5m, plasterboarded, and will be used for some storage.
Thanks in advance. Matt