Can anybody give me some idea's
moved into an old house extendedthe back of the house, added 2 extra rooms & extended 3 rooms in the process 12 rads in total.
the old system never realy much cop was extended this made matters worse, put in new bigger pump bigger bioler 4 years ago etc still no full heating.
am in the process of replaceing all the labyrinth of 15mm with 10mm & 2 - 6 port manifolds, put in 7 new rads.
before completeing change over to 2 mainfolds i have cut off all but 2 rads , 1 in the kitchen & one in the hall, kitchen on old 15mm & hall with 10mm, kitchen ok hot , hall luke warm.
have chased all air drained (whats left of the old system) but still no change to hall, with only 2 rads i should have been able to cook eggs on both!. pump working ok.
Any body any suggestions
thanks
moved into an old house extendedthe back of the house, added 2 extra rooms & extended 3 rooms in the process 12 rads in total.
the old system never realy much cop was extended this made matters worse, put in new bigger pump bigger bioler 4 years ago etc still no full heating.
am in the process of replaceing all the labyrinth of 15mm with 10mm & 2 - 6 port manifolds, put in 7 new rads.
before completeing change over to 2 mainfolds i have cut off all but 2 rads , 1 in the kitchen & one in the hall, kitchen on old 15mm & hall with 10mm, kitchen ok hot , hall luke warm.
have chased all air drained (whats left of the old system) but still no change to hall, with only 2 rads i should have been able to cook eggs on both!. pump working ok.
Any body any suggestions
thanks